Project Type:
Sable Projects designed and installed a fully electric plumbing and heating system using the Fischer Aquafficient boiler, alongside complete new copper pipework and two contemporary bathrooms
Location:
Iverna Gardens, Kensington W8
Client Goal:
This luxury apartment in Kensington required a modern, efficient, and space-saving hot-water solution
Hot Water System: Supplied and installed a Fischer Aquafficient electric boiler for instant, efficient hot-water delivery to all outlets.
Pipework Installation: Installed new copper pipework throughout using Geberit Mapress press-fit fittings for precision, speed, and long-term durability.
Bathrooms: Completed full plumbing and installation for two bathrooms, including showers, baths, basins, WCs, and concealed services.
Kitchen: Connected new hot and cold water supplies to all kitchen fittings and appliances.
System Commissioning: Completed pressure testing, flushing, and commissioning of the electric boiler and entire plumbing network.
1. Design & Planning
We collaborated with the client and interior designer to create an efficient, discreet installation tailored to a high-end apartment setting.
The Fischer Aquafficient system was selected for its compact size, instant hot-water capability, and suitability for electric-only environments.
2. Installation
Removed all existing pipework and outdated hot-water systems.
Installed new copper pipework using Geberit Mapress fittings for neat, precise, and durable joints.
Mounted and connected the Fischer Aquafficient electric boiler to supply both bathrooms and the kitchen.
Installed two new bathrooms with concealed pipework, wall-hung sanitaryware, and premium brassware.
Connected and tested kitchen water supplies for balanced pressure and consistent temperature.
4. Testing & Handover
All systems were pressure-tested, flushed, and commissioned for optimal performance.
The client received a full handover covering system operation, safety procedures, and routine maintenance guidance
All-Electric Requirement:
 With no gas supply, an efficient electric solution was required.
→ The Fischer Aquafficient provided a low-energy, on-demand hot-water system that eliminated the need for stored cylinders.
Limited Space:
 The compact plant area required a carefully planned layout.
→ Mapress fittings allowed fast, reliable joints in tight spaces without compromising service access.
Apartment Environment:
Working within an occupied building required careful coordination and noise management.
→ Installation was phased for minimal disruption to neighbouring residents.
The finished installation provides a seamless combination of modern design, sustainable performance, and quiet operation — ideal for luxury apartment living.
Instant, reliable hot water via the Fischer Aquafficient electric system
Durable copper pipework with Geberit Mapress fittings
Two modern, high-end bathrooms with concealed services
Compact, low-maintenance system ideal for limited spaces
Future-proof, sustainable solution with no gas dependency
This project showcases Sable Projects’ expertise in high-efficiency apartment installations, combining technical precision with refined aesthetics.
“Sable Projects provided a smart, efficient, and completely gas-free solution for our apartment.
The team’s precision and attention to detail were outstanding — every finish is perfect.
We love the instant hot water and the quiet performance of the system.”
— Homeowner, Kensington W8

Email: [email protected]
Phone: 020 7078 9415
Address Office: 2a Highland Drive, Hemel Hempstead HP3 8PT