
Aden Grove, Newington Green N16 – Full Plumbing & Heating Upgrade
ADEN GROVE, NEWINGTON GREEN N16
A Complete Low-Carbon Plumbing & Heating Transformation for a 4-Storey Townhouse

A Modern Home Needs a Modern System
Older London townhouses were never designed for today’s expectations of comfort, efficiency, and sustainability. At Aden Grove in Newington Green, the existing gas boiler and ageing plumbing simply couldn’t deliver reliable heating or consistent hot water across four floors.
The brief was clear:
remove the outdated system and replace it with a modern, energy-efficient setup that works effortlessly — everywhere in the home.
This project required careful design, precision installation, and a future-ready mindset.
PROJECT SNAPSHOT
✦ Location: Aden Grove, Newington Green, London N16
✦ Property Type: Four-storey terraced townhouse
✦ Scope: Full plumbing and heating system replacement, air source heat pump, unvented hot water, underfloor heating, radiators, two bathrooms, commissioning and handover
THE PROBLEM
In multi-storey townhouses, outdated systems create daily frustrations:
Inconsistent temperatures between floors
Slow or unreliable hot water
High energy usage with poor performance
Limited control over heating zones
Systems built for gas — not the future
This property needed more than a like-for-like replacement.
It needed a complete rethink — designed for efficiency, comfort, and long-term sustainability.

THE SOLUTION
We delivered a fully integrated, gas-free plumbing and heating system, designed to perform reliably across all four floors.
✔ Air Source Heat Pump System
Replacing the old gas boiler, the new heat pump delivers efficient, low-carbon heating designed for modern living.
✔ Unvented Hot Water Cylinder
Provides strong, consistent hot water pressure to every bathroom and outlet — even at peak demand.
✔ Wet Underfloor Heating (Lower Levels)
Installed across the lower floors for comfortable, even heat distribution with smart zoning controls.
✔ Radiators on Upper Floors
Modern radiators installed where faster heat response was required, perfectly balanced within the overall system.
✔ Two Fully Plumbed Bathrooms
Complete concealed pipework installations with premium fixtures and long-term reliability.
✔ Smart Controls & Zoning
Weather-compensated controls and thermostats to maximise comfort and reduce running costs.
OUR PROCESS
✦ 1. Design & Planning
Working closely with the client and builder, we designed the entire plumbing and heating layout from first principles.
This included:
– Full heat-loss calculations
– Correct heat pump sizing
– UFH and radiator zoning
– Hot-water demand planning
– Future maintenance access
This stage is where performance is won or lost — and we take it seriously.

✦ 2. Installation
The system was installed with a focus on precision and finish:
Concealed hot and cold water runs throughout the property
UFH pipework and manifolds installed before screeding
Radiators and sanitaryware fitted with accuracy
Heat pump and cylinder integrated into one efficient system
Every element was designed to work together — not in isolation.
✦ 3. Testing & Handover
Once installed, the system was:
✔ Pressure-tested
✔ Flushed and balanced
✔ Commissioned to manufacturer standards
The homeowner received a full walkthrough covering controls, thermostats, and system operation — ensuring confidence from day one.
CHALLENGES & SOLUTIONS
Tight Utility Space
We optimised the plant layout to house the heat pump, cylinder, and manifolds while maintaining clear access for servicing.
Retrofit Constraints
Careful first-fix planning allowed all pipework to remain concealed, preserving clean finishes throughout the home.
Efficiency Goals
Smart thermostats and weather-compensated controls ensured the system delivers comfort while minimising energy use.

THE OUTCOME
The completed system delivers exactly what the homeowner needed:
✔ Consistent, high-pressure hot and cold water
✔ Comfortable, even heating across all four levels
✔ Lower energy consumption and running costs
✔ A gas-free, low-carbon solution
✔ A clean, future-ready installation built for longevity
This is what happens when a system is designed properly from the start.
WHY THIS MATTERS FOR TOWNHOUSES LIKE THIS
Four-storey properties demand more from plumbing and heating systems. Without proper design, performance suffers — and costs rise.
This project shows how careful planning, modern technology, and precise installation can completely transform how a home feels day to day.
THE 3-STEP PLAN
1 — Tell Us About Your Property
We assess your home, layout, and goals.
2 — Receive a Clear System Design & Proposal
Transparent planning, no guesswork.
3 — Enjoy a Comfortable, Efficient Home
Built to last. Built for the future.
Planning a Plumbing or Heating Upgrade?
If you’re upgrading a townhouse or renovating a multi-storey home, we’d be happy to help.
👉 Contact us here:
https://sableprojects.co.uk/contact-us
