17 new washrooms and hot-water system at a Dulwich secondary school

Dulwich SE22 | School Washroom Refurbishment & Heating

November 17, 20253 min read

Secondary School, Dulwich SE22

Washroom Refurbishment & Hot Water Installation — Educational Facility


Delivering 17 Modern Washrooms & a High-Pressure Hot Water System — All Within an Eight-Week Holiday Window

Schools don’t get second chances. When the new term starts, everything must be finished, safe, and fully operational.

This secondary school in Dulwich SE22 required a complete washroom refurbishment across multiple areas of the building — 17 washrooms in total — along with a new high-capacity hot water system capable of handling heavy, simultaneous use.

The challenge? An eight-week summer holiday window to complete every installation, test every fixture, and hand over a fully functioning system ready for hundreds of students.

Sable Projects delivered on time, on programme, and to full specification.


Dulwich SE22 — Refurbished school washroom with wall-hung WCs and modern fittings by Sable Projects.


The School’s Challenge

This educational facility needed:

  • 17 new, modern washrooms

  • High-pressure hot water across the building

  • Durable, hygienic fittings suited to high traffic

  • Concealed services for easy cleaning and reduced damage

  • A reliable, low-maintenance hot-water system

  • Installation completed during the school holidays only

The stakes were high:
If the washrooms weren’t completed on time, the school would be unable to open key areas for the new academic year.

They needed a contractor who understood deadlines, compliance, and educational environments.

They needed Sable Projects.


Our Role: The Guide

We brought:

  • Strict programme control

  • Experienced multi-washroom coordination

  • Clean, safe on-site working practices

  • High-capacity commercial-grade hot-water solutions

  • Daily communication with site management

Our priority was simple:
Deliver a safe, durable, hygienic washroom installation — on time and to spec.


Our 3-Step Plan

1️⃣ Planning & Coordination — Build the Programme

We started with:

  • Detailed review of school layout & washroom design

  • Sequenced scheduling across 17 rooms

  • Coordination with tilers, partitioners & decorators

  • Hot-water system sizing & placement planning

Every day of the eight-week window was accounted for.


Dulwich SE22 — first-fix washroom plumbing with wall-hung WC frames.


2️⃣ First Fix — Build the Infrastructure

We installed:

  • Concealed hot & cold pipework

  • New waste & soil routes

  • Frames for wall-hung WCs and basins

  • A Telford Tempest 300L unvented hot water cylinder

  • Circulation system upgrades for pressure & flow

This created the foundation for a clean, durable, easy-to-maintain washroom system.


3️⃣ Second Fix & Commissioning — Deliver Performance

We completed:

  • Installation of WCs, basins, taps & accessories

  • Pressure testing & flushing of all systems

  • Full commissioning of the Telford Tempest hot-water system

  • Chlorination & hygiene compliance

  • Final decoration and handover

Everything was delivered before the new term began.


Dulwich SE22 — completed school washrooms with modern hygienic fittings.


Challenges & Solutions

1️⃣ Tight Programme (8 Weeks)

Challenge: 17 washrooms + hot water system across summer break.
Solution: Phased delivery plan with strict sequencing & contractor coordination.

2️⃣ Education Environment Compliance

Challenge: Noise, safety & hygiene requirements.
Solution: Holiday-only works + safe working protocols.

3️⃣ High System Demand

Challenge: Multiple washrooms needing simultaneous hot water.
Solution: Telford Tempest unvented cylinder sized & installed for constant pressure.


The Final Outcome (Transformation)

The school now benefits from:

  • 17 fully refurbished washrooms

  • Consistent high-pressure hot water throughout

  • Hygienic, durable, vandal-resistant fittings

  • Modern concealed pipework for easy cleaning

  • Reliable plumbing infrastructure built for heavy student use

  • A project completed on time and ready for the new term

This is high-performance plumbing for high-demand environments.


Key Takeaways

  • Educational facilities need durable, reliable plumbing

  • High-capacity unvented cylinders ensure constant hot water

  • Tight programmes require expert coordination

  • Sable Projects is trusted in high-traffic commercial environments


🔵 Start Your Commercial or Educational Plumbing Upgrade

Let’s design and install reliable, high-performance systems for your facility.

👉 Start Your Project — /contact-us
👉 See Our Services — /services
👉 View More Projects — /our-projects


🔗 Internal Links

Sable Projects is a trusted plumbing, heating & renewable specialist serving London & all Home Counties. We deliver expert advice, precision installations & long-term solutions for high-end homes & professional projects.

Sable Projects

Sable Projects is a trusted plumbing, heating & renewable specialist serving London & all Home Counties. We deliver expert advice, precision installations & long-term solutions for high-end homes & professional projects.

LinkedIn logo icon
Back to Blog