Dulwich SE22 | School Washroom Refurbishment & Heating
Secondary School, Dulwich SE22
Washroom Refurbishment & Hot Water Installation — Educational Facility
Delivering 17 Modern Washrooms & a High-Pressure Hot Water System — All Within an Eight-Week Holiday Window
Schools don’t get second chances. When the new term starts, everything must be finished, safe, and fully operational.
This secondary school in Dulwich SE22 required a complete washroom refurbishment across multiple areas of the building — 17 washrooms in total — along with a new high-capacity hot water system capable of handling heavy, simultaneous use.
The challenge? An eight-week summer holiday window to complete every installation, test every fixture, and hand over a fully functioning system ready for hundreds of students.
Sable Projects delivered on time, on programme, and to full specification.

The School’s Challenge
This educational facility needed:
17 new, modern washrooms
High-pressure hot water across the building
Durable, hygienic fittings suited to high traffic
Concealed services for easy cleaning and reduced damage
A reliable, low-maintenance hot-water system
Installation completed during the school holidays only
The stakes were high:
If the washrooms weren’t completed on time, the school would be unable to open key areas for the new academic year.
They needed a contractor who understood deadlines, compliance, and educational environments.
They needed Sable Projects.
Our Role: The Guide
We brought:
Strict programme control
Experienced multi-washroom coordination
Clean, safe on-site working practices
High-capacity commercial-grade hot-water solutions
Daily communication with site management
Our priority was simple:
Deliver a safe, durable, hygienic washroom installation — on time and to spec.
Our 3-Step Plan
1️⃣ Planning & Coordination — Build the Programme
We started with:
Detailed review of school layout & washroom design
Sequenced scheduling across 17 rooms
Coordination with tilers, partitioners & decorators
Hot-water system sizing & placement planning
Every day of the eight-week window was accounted for.

2️⃣ First Fix — Build the Infrastructure
We installed:
Concealed hot & cold pipework
New waste & soil routes
Frames for wall-hung WCs and basins
A Telford Tempest 300L unvented hot water cylinder
Circulation system upgrades for pressure & flow
This created the foundation for a clean, durable, easy-to-maintain washroom system.
3️⃣ Second Fix & Commissioning — Deliver Performance
We completed:
Installation of WCs, basins, taps & accessories
Pressure testing & flushing of all systems
Full commissioning of the Telford Tempest hot-water system
Chlorination & hygiene compliance
Final decoration and handover
Everything was delivered before the new term began.

Challenges & Solutions
1️⃣ Tight Programme (8 Weeks)
Challenge: 17 washrooms + hot water system across summer break.
Solution: Phased delivery plan with strict sequencing & contractor coordination.
2️⃣ Education Environment Compliance
Challenge: Noise, safety & hygiene requirements.
Solution: Holiday-only works + safe working protocols.
3️⃣ High System Demand
Challenge: Multiple washrooms needing simultaneous hot water.
Solution: Telford Tempest unvented cylinder sized & installed for constant pressure.
⭐ The Final Outcome (Transformation)
The school now benefits from:
17 fully refurbished washrooms
Consistent high-pressure hot water throughout
Hygienic, durable, vandal-resistant fittings
Modern concealed pipework for easy cleaning
Reliable plumbing infrastructure built for heavy student use
A project completed on time and ready for the new term
This is high-performance plumbing for high-demand environments.
⚡ Key Takeaways
Educational facilities need durable, reliable plumbing
High-capacity unvented cylinders ensure constant hot water
Tight programmes require expert coordination
Sable Projects is trusted in high-traffic commercial environments
🔵 Start Your Commercial or Educational Plumbing Upgrade
Let’s design and install reliable, high-performance systems for your facility.
👉 Start Your Project — /contact-us
👉 See Our Services — /services
👉 View More Projects — /our-projects